Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Beijing Tianyu Shunjie Domestic Service Company

air conditioning fluoridation air conditioning repair air conditioning instal...

sell
  • There is no classification
contact
  • Contact:王师傅
  • Phone:010-67438882
  • Email:zhuanyekongtiao@126.com
  • fax:010-67438882
search
 
link
  • There is no link yet
home > sell > Shunyi air conditioning relocation, installation, air conditioning fluoride maintenance
Shunyi air conditioning relocation, installation, air conditioning fluoride maintenance
products: Views:21Shunyi air conditioning relocation, installation, air conditioning fluoride maintenance 
price: 面议
MOQ:
Total supply:
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2017-02-25 11:16
 
Details
Shunyi Tianyu air conditioning relocation professionals provide you with the most reliable services. Shunyi air conditioning plus fluoride, Shunyi air conditioning repair, Shunyi air conditioning installation, Shunyi air conditioning repair, Shunyi air conditioning relocation, Shunyi air conditioning refrigeration accessories, Shunyi air conditioning maintenance, special expertise in air conditioning relocation, air conditioning fluorination, air conditioning installation, air conditioning repair. Air conditioner disassembly and assembly, air conditioner repair and quick repair, our company's professionals serve customers attentively and strive to build a well-known air conditioner repair and refrigeration brand in Shunyi District. Our professionals will explain to you the preparations for air conditioner installation. Preparation work will be measured and surveyed where the air conditioner will be reinstalled. The installation location of the outdoor unit should meet the following requirements. The ground or wall should be able to bear the weight of the unit and the vibration-free installation location should be convenient for operation, adjustment and maintenance. The noise and hot and cold wind condensation generated when the outdoor unit is running should not affect the work, study and life of others. There should be no leakage of flammable gas around the outdoor unit and the outdoor unit should be installed in a well-lit place as much as possible. The installation position of the indoor unit of the air conditioner should meet the following requirements to avoid direct sunlight on the unit, away from heat sources, and away from obstacles at the air inlet and outlet of the indoor unit. Measure the distance between the indoor and outdoor units. The distance between the indoor and outdoor machines should be less than one meter. If it is larger than one meter, new connecting copper pipes should be prepared. Measure the position difference between the internal and external machines. The distance between the indoor and outdoor units should be less than one meter, otherwise it will reduce the cooling capacity of the air conditioner, increase the compressor load, and cause overload startup. When installing the air conditioner, after determining the location of the indoor and outdoor units according to the above principles, immediately install the hanging plate of the indoor unit. After the hanging plates of the outdoor unit and the indoor unit are firmly installed, straighten the connecting pipes and check whether there are any bends in the pipes. Next, you should Check whether there are cracks in the bell mouths at both ends. If there are cracks, they should be re-expanded, otherwise fluorine will leak. Finally, check whether there is a short circuit or open circuit in the control line. After confirming that the outlet pipe of the pipeline control line is in good condition, tie them together and seal the connecting pipe opening. When crossing a wall, two people should cooperate inside and outside the wall to cross slowly to avoid strain. Connect the pipes to the internal and external machines, and connect the control lines. Next, remove the air from the ducts and indoor unit. The method is as follows: Tighten the connected external machine joint tightly. Use a special wrench to loosen the valve stem ring of the stop valve. When you hear a rough squeaking sound from the outdoor machine joint, use a hand to tighten the thick joint and loosen the stop valve on the thick pipe. Completely loosen the valve stem of the stop valve on the thin pipe. At this time, the emptying of the space-time wither is completed. Finally, use detergent to detect leaks and carefully observe whether there are bubbles emerging from each joint. After verifying that there is no leakage in the system, tighten the valve safety cap and start the final step of air conditioning installation. After the installation of the air conditioner is completed, an independent power line for the air conditioner should be installed. The power line for household split air conditioners generally has stranded copper core wires. Sockets are specifications. Check the voltage before turning on the power, and then use the remote control to start operation. After the outdoor unit is working, check whether the operating current is consistent with the nameplate mark. If the current is less than the nameplate mark, it can be considered that the amount of Freon is low. Do not rush to add fluorine. You can continue to observe the condensation or frost at the pipe joints. The normal operation of any split air conditioner should meet the following conditions. The low-pressure pressure connecting pipe can only form condensation and cannot form frost. The operating current is inconsistent with what is marked on the nameplate. The air outlet temperature of the internal unit meets the requirements, that is, 1℃ in summer and ℃ in winter. Indoor temperature, ℃ in summer, ℃ in winter.
Request for quotation
A total of0articles  Related Comments: